Oversized pallet wrapping: 35% lower film cost

Large loads. A workstation built around the process.

A logistics customer needed to replace manual wrapping of oversized pallets and make film use more predictable. A specially configured semi-automatic Wrapper SA reduced wrapping time by more than 70% and film cost per pallet by 35% in this installation.

< 2 minutesBottom–top–bottom wrapping cycle
> 70% shorterWrapping time compared with manual work
35% lowerFilm cost per pallet

The challenge

Oversized loads and manual wrapping.

Loads beyond a standard workstation

The customer handled large products packed in cartons, with loads reaching 2,300 mm in length, 1,200 mm in width and 2,500 mm in height. Standard wrapper configurations did not meet the needs of this station.

Variable time and material use

Manual wrapping occupied the operator throughout the wrapping process. Film consumption and protection varied between operators, making film cost per pallet, purchasing and stock requirements harder to predict.

The solution

Wrapper SA with a 2,500 mm turntable and two ramps.

Matched to the load and layout

After consultation, POLPACK ZEUS selected a special Wrapper SA configuration with a 2,500 mm turntable. Two ramps allow pallets to enter from one side and leave from the other, helping organise the flow of large loads.

Semi-automatic operation

The operator loads and removes the pallet and performs the required handling tasks. The wrapping cycle then follows the selected programme automatically. During that cycle, the operator is freed from manually carrying the film roll around the load.

Machine and film

250% powered pre-stretch with 15 µm stretch film.

The film system

A motorised pre-stretch carriage operates at a 250% pre-stretch setting in this installation. This describes the machine's film-stretching setting before the film reaches the load; it is not a percentage saving.

A coordinated change

We selected 15 µm stretch film to replace the previously used conventional 23 µm film. The result came from matching the material, pre-stretch system and wrapping programme, giving better control over the amount applied and more repeatable wrapping.

Wrapping cycle

Less than two minutes: bottom, top, bottom.

More than 70% shorter wrapping time

After optimisation, the wrapping cycle for this large pallet took less than two minutes, more than 70% shorter than the previous manual process. The figure covers wrapping only; pallet loading and removal are separate tasks.

An overlapping upward and downward wrap

Film is applied from the bottom of the load to the top and then back down, where the cycle ends. The selected wrapping pattern helps stabilise the load on the pallet.

Film cost

A 35% reduction compared with the previous process.

What was compared

Film cost per pallet fell by 35% compared with the previous method using 23 µm film. This is a film-cost result, not a claim that all packing costs or film weight fell by the same percentage.

Illustrative calculation

For a pallet previously using PLN 5.00 worth of film, a 35% reduction would mean approximately PLN 3.25 after optimisation, saving PLN 1.75. These currency values illustrate the percentage; they are not presented as a separate measured cost record. The example excludes labour, energy and the machine purchase.

More predictable operation

The repeatable programme made material use for comparable loads easier to predict and helped plan film purchases. Operators no longer had to wrap manually during the machine cycle.

Project-specific results

The results apply to this customer's process after optimisation. For another site, we assess its loads, film and working conditions before selecting a configuration.

Logistics / Wrapper SA

Project facts

These parameters describe this particular installation and do not establish the specification or results of every project.

Oversized pallet wrapping: 35% lower film cost — Logistics / Wrapper SA
MachineSemi-automatic Wrapper SA
ApplicationOversized pallets in logistics
Maximum load dimensions in this projectLength 2,300 mm × width 1,200 mm × height 2,500 mm
Turntable diameter2,500 mm
Pallet handlingTwo ramps
Powered pre-stretch setting250%
Selected stretch film15 µm; previously 23 µm
ProgrammeBottom–top–bottom
Wrapping timeLess than 2 minutes, excluding loading and removal
Reported improvementOver 70% shorter wrapping time; 35% lower film cost

Original installation photographs

See the equipment and layout.

Wrapper SA with a large yellow turntable and ramp at the customer's logistics warehouse
Wrapper SA with a large yellow turntable and ramp at the customer's logistics warehouse
Wrapper SA control panel and film carriage, with two ramps serving the turntable
Wrapper SA control panel and film carriage, with two ramps serving the turntable
Wrapper SA wrapping station beside the customer's warehouse racking
Wrapper SA wrapping station beside the customer's warehouse racking

Project lead: Tomasz Siwiaszczyk, Sales Manager, POLPACK ZEUS

Frequently asked questions

Is this a fully automatic pallet wrapping line?

No. This installation uses a semi-automatic Wrapper SA. The operator handles the pallet and required operating tasks; the programmed wrapping cycle runs automatically.

Does the cycle time include pallet handling?

No. Less than two minutes refers to wrapping only. Loading and removing the pallet are separate operations.

Selection and operation

Useful before choosing your machine.

Pallet wrapper selection guide

Compare machine types, film systems and the questions to ask when planning a workstation.

Read the English guide ↗

Pallet-wrapper safety guide (Polish) · Semi-automatic wrapper operating tips (Polish)

Talk to POLPACK ZEUS

Tell us about your pallets and process.

Send load dimensions and weights, required throughput, loading method, available space and operating conditions. Photographs or a short video help us assess the application.

info@polpack.pl · Bukowiecka 75, Warsaw, Poland